Construction Plastic Formwork PVC Concrete Formwork Tecon Plastic Formwork

Product Details
Customization: Available
After-sales Service: 2 Years
Warranty: 2 Years
Still deciding? Get samples of US$ 15/Piece
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Diamond Member Since 2022

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Experienced Team
The supplier has 6 foreign trading staff(s) and 6 staff(s) with over 6 years of overseas trading experience
to see all verified strength labels (15)
  • Construction Plastic Formwork PVC Concrete Formwork Tecon Plastic Formwork
  • Construction Plastic Formwork PVC Concrete Formwork Tecon Plastic Formwork
  • Construction Plastic Formwork PVC Concrete Formwork Tecon Plastic Formwork
  • Construction Plastic Formwork PVC Concrete Formwork Tecon Plastic Formwork
  • Construction Plastic Formwork PVC Concrete Formwork Tecon Plastic Formwork
  • Construction Plastic Formwork PVC Concrete Formwork Tecon Plastic Formwork
Find Similar Products
  • Overview
  • Product Description
  • Company Profile
Overview

Basic Info.

Model NO.
BZ-PP
Type
Flat
Material
PP
Forming Way
Extrusion
Application
Functional Components
Material Properties
High Impact
Markets Served
Building & Construction
Customized
Non-Customized
Usage
Exterior
Color
Single Color
Surface Finishing
Finished
Certificate
ISO9001:2015
Thickness
12-21mm
Reusable Times
50 Times
Advantage
Waterproof and Lightweight
Transport Package
Pallets
Specification
1220*2440mm/915*1830mm
Trademark
Beizhu
Origin
China
HS Code
3925900000
Production Capacity
1000 PCS/Day

Packaging & Delivery

Package Size
100.00cm * 100.00cm * 100.00cm
Package Gross Weight
1400.000kg

Product Description

Product Description

Product Specification
Construction Plastic Formwork PVC Concrete Formwork Tecon Plastic Formwork

STANDARD SIZE THICKNESS WEIGHT/PC QTY/20FT QTY/40HQ
2440*1220MM 12 MM 21 KGS 560 PCS 1260 PCS
2440*1220MM 15 MM 24 KGS 450 PCS 1026 PCS
2440*1220MM 18 MM 28 KGS 400 PCS 900 PCS
2440*1220MM 20 MM 30 KGS 250 PCS 800 PCS

Cutting and customized size are available.

Product Advantages
1. Durable, the reusable time can reach more than 60 times, long service life.
2. No absorption of moisture, no deformation, no mildew; Long-term immersion stratification in the water,
no bubbles, sheet size stability, especially suitable for underground and damp environment.
3. Demould easily. No need brushing release agent, only tapping, the formwork will fall off. 
Shorten working
hours
 and speed up the construction schedule efficiently.

4. Easy to process. Sawing, drilling and nailing are all available. Formworks can be combined vertically 
and horizontally optionally.

5. Light weight, high strength, high hardness, impact resistance, wear resistance.

6. Surface is smooth, bright and clean; concreting and forming effect is good.

7.  Good toughness. It could be used as cambered special-shaped formwork.

8. Acid and alkali resistance, corrosion resistance; Very suitable for the engineeringapplication in 

coastal areas, mine, as well as seawall. It is need not do any preservative treatment both in using and
storing the formwork, which do not 
pollute the concrete surface.

9. Waste products can be recycled and reprocessed, making full use of waste materialsThis property 
can greatly 
reduce the project cost compared with wooden formwork and bamboo formwork.

10. Environmental protection and energy saving, no pollution. No any poisonous or harmful gas. 

11. Easy to remove. Removing is convenient, quick and safe, and the supporting is also easy to operate,
advantageous 
to the organization construction, effectively improving the construction schedule.

 

Construction Plastic Formwork PVC Concrete Formwork Tecon Plastic Formwork


Product Application
Construction Plastic Formwork PVC Concrete Formwork Tecon Plastic Formwork
Construction Plastic Formwork PVC Concrete Formwork Tecon Plastic Formwork
Construction Plastic Formwork PVC Concrete Formwork Tecon Plastic FormworkConstruction Plastic Formwork PVC Concrete Formwork Tecon Plastic Formwork
Instruction of using Beizhu plastic formwork and H20 beam:
1. Use method is the same as wooden formwork, hollow plastic formwork and batten should be in cross shaped;
2. No need to brush the mold release agent before using formwork;
3. The distance between timbers for 18mm thickness: (A) According to the thickness of the slab concrete, if the
thickness of slab concrete is less than
15cm, the timbers distance should be 350-400mm. If the thickness of slab
concrete is more than 15cm, the distance should be 300-350mm. (B) The distance between timbers of the shear
wall is adjusted by the height and
thickness of the wall. For example, the wall is 2800 mm high and 300 mm thick,
timbers distance should be 200-250 mm with 18mm thick plastic
formwork. If the shear wall width or the pillar is
thick more than 1m, must
add the fixed frame.
4. There shouldn't be gaps between the die shear wall and column combining, there must be timbers in internal
angle (the bottom of the wall) beam to
insure the beam frame, wall and formwork connect well. For shear wall,
formwork must be assembled into the whole piece, then hoisting, adjust to be straight. This way can reduce
labor intensity, as well as improve the
forming effect.
5. When nailing the formwork and H20 beam, the distance away from formwork edge should be 15-30 mm, the
strength of driving in nail should
be moderate; length of nails should be 40-50 mm, not too long or too short.
6. There must be a 15mm seam alowance for the wood in the beam bottom, make the wallboard stand on seam
allowance of wood square, thus can
ensure no leakage of slurry and save wallboard material efficiently.
7. Please avoid the peak temperature in one day when matching the mold. Then the effect after releasing mould
is better. Normally, there is no space
between formworks, but if the temperature difference is 5-10ºC, then should
reserve 1-2mm gap.
8. Please place the PP formwork as flat as plywood formwork after releasing the mould.

Product Using Feedback
Construction Plastic Formwork PVC Concrete Formwork Tecon Plastic Formwork

 
Company Profile

                                                                           
                                                                 Beizhu Plastic Formwork Company
 

Beizhu Plastic Formwork Company was founded in 2008, is located in Suqian City,which is one of the
largest manufacturers of construction plastic formwork in China
. Beizhu has production area about 12000
square meters, 5 production lines and 100 workers.

 

The construction plastic formwork has been exported to Finland, Canada, Australia, Russia, Ukraine, Kenya
Thailand, Korea and so on. Now Beizhu has 2 agents in Turkey and Thailand.

 

In 2013 year,Beizhu adopted the Certificate of ISO9001:2008 International Quality Management System. 
Beizhu keeps long-term cooperation with all the customers all over the world.

Construction Plastic Formwork PVC Concrete Formwork Tecon Plastic Formwork

 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier